Close the wizard and perform a system reboot to allow changes to take effect. Read EULA (End User License Agreement) and agree to proceed with the installation process. Allow Windows to run the file (if necessary). Locate and double-click on the available setup file. Unzip the file and enter the newly-created directory. Save the downloadable package on an accessible location (such as your desktop). To install this package please do the following: Even though other OSes might be compatible as well, we do not recommend applying this release on platforms other than the ones specified. If it has been installed, updating (overwrite-installing) may fix problems, add new functions, or expand existing ones. This package contains the files needed for installing the Battery Health Charging utility. Security: Finger Print Reader, BIOS Booting User Password Protection, Security lock Card Reader: Multi-format card reader (SDXC/SDHC/SD) Solid State Drives: 512GB SSD SATA3, 256GB SSD SATA3 Hard Drives: 500GB 5400RPM SATA HDD, 1TB 5400RPM SATA HDD Graphics: Integrated Intel HD Graphics 620 Memory: 4 GB Onboard Memory DDR4 2133MHz SDRAM, 1 x SO-DIMM socket for expansion, up to 12 GB SDRAM, up to 16 GB SDRAM Processor: Intel Core i7 7500U, i3 7100U, or i5 7200U Processors
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |